Optimalisasi Kinerja Proyek Konstruksi melalui Pendekatan Lean Construction di Manokwari

Penulis

  • Natalia E Safkaur Universitas Papua Penulis

DOI:

https://doi.org/10.65310/gqqaaq22

Kata Kunci:

School Website Optimization, Alumni Directory Integration, Organizational Structure Transparency, Information Management, Digital Governance.

Abstrak

This study examines the optimization of school websites as information centers through the integration of alumni directories and organizational structures to enhance institutional communication and data management effectiveness. The research highlights that a well-structured website system not only functions as a medium for information dissemination but also as an integrated institutional database that supports digital-based governance in educational environments. The integration of alumni directories facilitates sustainable communication between schools and graduates, enabling stronger institutional networks and broader stakeholder engagement. The transparent presentation of organizational structures improves institutional accountability and accessibility of information for internal and external users. The synergy between these integrated features contributes to the development of an adaptive and responsive information system capable of supporting administrative needs and public communication. Ultimately, this implementation enhances the quality of educational information services and strengthens the institutional image in responding to the demands of digital transformation in the era of information technology.  

 

Unduhan

Data unduhan tidak tersedia.

Referensi

Abdelmegid, M. A., González, V. A., O’Sullivan, M., Walker, C. G., Poshdar, M., & Alarcón, L. F. (2023). Exploring the links between simulation modelling and construction production planning and control: a case study on the last planner system. Production Planning & Control, 34(5), 459-476. https://doi.org/10.1080/09537287.2021.1934588.

Albalkhy, W., & Sweis, R. (2021). Barriers to adopting lean construction in the construction industry: a literature review. International Journal of Lean Six Sigma, 12(2), 210-236. https://doi.org/10.1108/IJLSS-12-2018-0144.

Angguningtyas, T. R. P., & Beatrix, M. (2024). Analisis Waste Material dengan Pendekatan Lean Construction pada Proyek Pembangunan Rumah Dinas. Journal of Scientech Research and Development, 6(1), 505-512. https://doi.org/10.56670/jsrd.v6i1.360.

Aslam, M., Gao, Z., & Smith, G. (2020). Exploring factors for implementing lean construction for rapid initial successes in construction. Journal of cleaner production, 277, 123295. https://doi.org/10.1016/j.jclepro.2020.123295.

Danureswara, R. R. (2025). Evaluasi Non-Physical Waste Pada Proyek Pembangunan Gedung Rumah Sakit X Dengan Penerapan Lean Construction. Journal of Applied Civil Engineering and Infrastructure Technology, 6(1), 25-29. https://doi.org/10.52158/jaceit.v6i1.964.

Elkhashen, E., & Ntim, C. (2018). Accounting and philosophy: The construction of social reality framework. Journal of accounting and Taxation, 10(3), 29-36. http://dx.doi.org/10.5897/JAT2017.0277.

Fiorillo, A., Sorrentino, A., Scala, A., Abbate, V., & Dell'aversana Orabona, G. (2021). Improving performance of the hospitalization process by applying the principles of Lean Thinking. The TQM Journal, 33(7), 253-271. https://doi.org/10.1108/TQM-09-2020-0207.

Garcés, G., & Peña, C. (2023). A review on lean construction for construction project management. Revista ingeniería de construcción, 38(1). https://doi.org/10.7764/RIC.00051.21.

Hardiyati, C., & Tethool, Y. C. V. (2023). Pemanfaatan limbah abu sekam padi sebagai bahan pembuatan beton normal di kabupaten manokwari selatan. Prosiding Semsina, 4(01), 50-53. https://doi.org/10.36040/semsina.v4i01.7938.

Harianja, T. R., & Manurung, E. H. (2026). Pengembang Metode Menajemen Proyek Konstruksi untuk Meningkatkan Efisiensi. INOMATEC: Jurnal Inovasi dan Kajian Multidisipliner Kontemporer, 1(03).

Hidayah, N., Orisu, L. M., & Rahayu, Y. P. (2024). Hubungan Faktor Penduduk Usia Produktif, Upah dan Kontribusi Sektor Konstruksi Terhadap Ketimpangan Distribusi Pendapatan di Kabupaten Manokwari. Lensa Ekonomi, 18(01), 1-14. https://doi.org/10.30862/lensa.v18i01.356.

Indriani, S. N., & Wirdianto, A. (2025). Analisis Variance pada Penerapan Lean Construction Terhadap Waktu Produksi Proyek EPC (Studi Kasus Proyek Mogas PT XYZ). Jejak digital: Jurnal Ilmiah Multidisiplin, 1(5), 3095-3113. https://doi.org/10.63822/2jmv1j28.

Li, S., Fang, Y., & Wu, X. (2020). A systematic review of lean construction in Mainland China. Journal of cleaner production, 257, 120581. https://doi.org/10.1016/j.jclepro.2020.120581.

Malir, A. M. A., Sudarwadi, D., & Saptomo, Y. H. (2019). Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Pekerjaanproyek Konstruksi di Kabupaten Manokwari (Studi Kasus: PT. Jabez Perkasa). Cakrawala Management Business Journal, 1(1), 152-171. https://doi.org/10.30862/cm-bj.v1i1.10.

Mandasari, F., Marsudi, S., & Sholichin, M. (2023). Studi Manajemen Pelaksanaan Konstruksi Bendung Pltm Prafi Kecamatan Warmare Kabupaten Manokwari Provinsi Papua Barat dengan Menggunakan Microsoft Project Manager 2013. Jurnal Teknologi dan Rekayasa Sumber Daya Air, 3(1), 79-87. https://doi.org/10.21776/ub.jtresda.2023.003.01.08.

Manurung, E. H., Hutagaol, K., & Putrafakhmi, D. (2026). Implementasi Lean Construction Untuk Meningkatkan Efisiensi Proyek. Sinergi: Jurnal Riset Ilmiah, 3(1), 202-207. https://doi.org/10.62335/sinergi.v3i1.2235.

Rumbarar, H., Sudarwadi, D., & Saptomo, Y. H. (2019). Pengaruh Kualitas Manajer Proyek Terhadap Kinerja Proyek Konstruksi di Kabupaten Manokwari Selatan (Studi Kasus Kontraktor di Distrik Ransiki). Cakrawala Management Business Journal, 2(1), 204-223. https://doi.org/10.30862/cm-bj.v2i1.14.

Setiawan, A. Pengaruh dan Hubungan Timbal Balik antara Sektor Pertambangan Konstruksi: Studi Kasus Manokwari Selatan. Jurnal GEOSAPTA, 10(1), 85-95. https://dx.doi.org/10.20527/jg.v10i1.17066.

Singh, S., & Kumar, K. (2020). Review of literature of lean construction and lean tools using systematic literature review technique (2008–2018). Ain Shams Engineering Journal, 11(2), 465-471. https://doi.org/10.1016/j.asej.2019.08.012.

Triwibowo, A. P. (2022). Analisis Faktor-Faktor Penyebab Keterlambatan Pada Proyek Konstruksi Jalan Di Wilayah Manokwari Papua Barat. Skripsi, Universitas Islam Indonesia.

Unduhan

Diterbitkan

2026-02-20

Cara Mengutip

Optimalisasi Kinerja Proyek Konstruksi melalui Pendekatan Lean Construction di Manokwari. (2026). Journal of Engineering and Applied Technology, 2(1), 39-48. https://doi.org/10.65310/gqqaaq22