Analysis of Workforce Planning to Achieve Production Targets at PT. ABC President Indonesia, Karawang Branch

Authors

  • Tasya Fadillah Zaenal Universitas Teknologi Digital Author
  • Resya Dwi Marselina Universitas Teknologi Digital Author
  • Nadira Yuniar Universitas Teknologi Digital Author
  • Novitri Lestari Universitas Teknologi Digital Author
  • Desna Girsang Universitas Teknologi Digital Author

DOI:

https://doi.org/10.65310/m9hnj694

Keywords:

Workforce Planning, Production Targets, Workload Analysis, Full-Time Equivalent, Productivity

Abstract

This study aims to analyze workforce planning in support of achieving production targets at PT. ABC President Indonesia’s Karawang Branch. The study employs a qualitative approach using a case study design. Primary data was obtained through in-depth interviews with the Head of the Research and Development (R&D) Department, while secondary data was sourced from organizational documents, job descriptions, and the company’s operational reports. Data analysis was conducted through data reduction, data presentation, and drawing conclusions using source and document triangulation techniques to ensure the credibility of the findings. The research results indicate that workforce planning is conducted systematically through workload analysis, work time measurement, and the application of the Full-Time Equivalent (FTE) method to determine the appropriate workforce size aligned with production capacity. The application of this method enables the company to identify conditions of overload or underload on production lines, thereby allowing for more effective workforce distribution. The findings also indicate that the achievement of production targets is influenced by the alignment between workforce capacity, machine capacity, and operational control mechanisms. The integration of workforce planning with the production target validation process contributes to improved operational efficiency, reduced production bottlenecks, and the sustainability of company performance.

 

Downloads

Download data is not yet available.

References

Agustina, R. (2025). Strategi Produktivitas Tenaga Alih Daya: Peran Kontrak Kerja, Target Produksi, Dan Lean Workplace. Cermin: Jurnal Penelitian, 9(1), 80-91. https://doi.org/10.36841/cermin_unars.v9i1.6593.

Anugerah, R., & Devi, M. (2014). Pendekatan Program Linier Dalam Perencanaan Tenaga Kerja Pada Dept. Head Analize Di Pt. Indonesia Epson Industri. JISI: Jurnal Integrasi Sistem Industri, 1(1). https://doi.org/10.24853/jisi.1.1.%25p.

Aprillia, D. D., Sianturi, A. P., & Rizal, M. (2025). Implementasi anggaran tenaga kerja dalam perencanaan keuangan PT Industri Telekomunikasi Indonesia (Persero). Jurnal Akademik Ekonomi Dan Manajemen, 2(1), 537-545. https://doi.org/10.61722/jaem.v2i1.4203.

Ashley, B. A., & Mahachandra, M. (2023). Penentuan Jumlah Tenaga Kerja Optimal Berdasarkan Waktu Baku Dengan Metode Work Sampling Pada Stasiun Kerja Scouring-Bleaching (Studi Kasus: PT XYZ). Industrial Engineering Online Journal, 12(4).

Astuti, S., Lusia, V., & Khairunnisa, A. (2020). Perhitungan Waktu Standart Untuk Menentukan Jumlah Tenaga Kerja dan Kebutuhan Mesin/Alat Pada Proses Produksi Reagen Alat/Asat (GPT) FS (IFCC mod) di PT. PDL. Jurnal KaLIBRASI: Karya Lintas Ilmu Bidang Rekayasa Arsitektur, Sipil, Industri, 3(2), 1-19. https://doi.org/10.37721/kalibrasi.v3i2.738.

Aulia, O., Nuha, H., & Murnawan, H. (2025). Optimasi Perencanaan Produksi dengan Multiobjective: Implementasi Model Goal Programming. RIGGS: Journal of Artificial Intelligence and Digital Business, 4(2), 3320-3329. https://doi.org/10.31004/riggs.v4i2.1022.

Cahyadi, E. R., & Hidayati, N. (2022). Peramalan dan penentuan target produksi kedelai nasional. Jurnal Risalah Kebijakan Pertanian dan Lingkungan, 9(1), 18-27. https://doi.org/10.29244/jkebijakan.v7i1.28035.

Chandrahadinata, D., & Oktaviansyah, R. M. (2025). Perencanaan Peningkatan Produktivitas Dengan Menggunakan Metode American Productivity Center (APC) Pada PD ABC. Jurnal Kalibrasi, 23(2), 284-295. https://doi.org/10.33364/kalibrasi/v.23-2.1964.

Edi, A. G. S., Jabawidhiartha, M. Y., & Kuncoro, A. J. (2024). Analisis beban kerja berdasarkan metode full time equivalent untuk penentuan kebutuhan tenaga kerja secara efektif. Jurnal Teknologi dan Manajemen Industri Terapan, 3(2), 96-104. https://doi.org/10.55826/jtmit.v3i2.299.

Hudaningsih, N. (2019). Analisis Kebutuhan Karyawan Dengan Menggunakan Metode Full Time Equivalent (FTE) Pada Departemen Produksi PT. Borsya Cipta Communica. Jurnal Tambora, 3(2), 98-106. https://doi.org/10.36761/jt.v3i2.278.

Irsyad, F. R., Lubis, P. K. D., Naibaho, A. R. O., & Sinurat, N. A. (2024). Analisis strategi perencanaan tenaga kerja untuk meningkatkan efisiensi dan produktivitas dalam organisasi. Innovative: Journal Of Social Science Research, 4(4), 3328-3333. https://doi.org/10.31004/innovative.v4i4.11919.

Kabul, E. R., & Febrianto, M. N. (2022). Implementasi metode Full Time Equivalent (FTE) dalam analisis kebutuhan tenaga kerja. Ikraith-Ekonomika, 5(1), 162-168. https://doi.org/10.37817/ikraith-ekonomika.v5i1.

Kusuma, T. I., Prihadianto, R. D., & Istiqomah, S. (2024). Evaluasi Target Produksi Gula Kristal Putih PT. X dengan Pendekatan Perencanaan Produksi dan Analisis Investasi dalam Pemenuhan Permintaan Gula Nasional. Jurnal Flywheel, 15(1), 8-17. https://doi.org/10.36040/flywheel.v15i1.9253.

Maulana, A., & Wibowo, B. (2021). Analisis Jumlah Tenaga Kerja Optimal Dengan Metode Work Load Analysis (WLA) di PT. RSI. Journal of Applied Mechanical Engineering and Renewable Energy, 1(1), 24-29. https://doi.org/10.52158/jamere.v1i1.96.

Murnawan, H. (2014). Perencanaan Produktivitas Kerja Dari Hasil Evaluasi Produktivitas Dengan Metode Fishbone Di Perusahaan Percetakan Kemasan Pt. X. Heuristic, 11(01). https://doi.org/10.30996/he.v11i01.611.

Novantoro, H., & Singgih, M. (2023). Analisis Beban Kerja Dan Penentuan Jumlah Karyawan Divisi Produksi Dalam Menyelesaikan Target Dari Perusahaan. Jurnal Ilmiah Teknik dan Manajemen Industri, 3(1), 632-644. https://doi.org/10.46306/tgc.v3i1.116.

Rusnadi, A. R., & Herwanto, D. (2021). Perencanaan jadwal induk produksi komponen band komp battery di PT. Mada Wikri Tunggal. STRING (Satuan Tulisan Riset dan Inovasi Teknologi), 5(3), 299-306. http://dx.doi.org/10.30998/string.v5i3.8615.

Sari, E. M., & Darmawan, M. M. (2020). Pengukuran waktu baku dan analisis beban kerja pada proses filling dan packing produk lulur mandi di PT. Gloria Origita Cosmetics. Jurnal ASIIMETRIK: Jurnal Ilmiah Rekayasa & Inovasi, 51-61. https://doi.org/10.35814/asiimetrik.v2i1.1253.

Setiabudi, Y., Afma, V. M., & Irwan, H. (2018). Perencanaan Kapasitas Produksi ATV12 Dengan Menggunakan Metode Rough Cut Capacity Planning (RCCP) Untuk Mengetahui Titik Optimasi Produksi (Studi kasus di PT Schneider Electric Manufacturing Batam). PROFISIENSI: Jurnal Program Studi Teknik Industri, 6(2), 80-87. https://doi.org/10.33373/profis.v6i2.1620.

Soeltanong, M. B., & Sasongko, C. (2021). Perencanaan produksi dan pengendalian persediaan pada perusahaan manufaktur. JRAP (Jurnal Riset Akuntansi dan Perpajakan), 8(1), 14-27. https://doi.org/10.35838/jrap.2021.008.01.02.

Yani, A. S. (2017). Pengaruh Perencanaan Kebutuhan Bahan Baku Dan Pengawasan Mutu Bahan Baku Terhadap Kelancaran Proses Produksi Pada Industri Otomotif. Business Management Journal, 13(2). http://dx.doi.org/10.30813/bmj.v13i2.920.

Published

2026-06-08

How to Cite

Analysis of Workforce Planning to Achieve Production Targets at PT. ABC President Indonesia, Karawang Branch. (2026). Journal of Economics, Management, and Accounting, 2(1), 125-134. https://doi.org/10.65310/m9hnj694