K3 Performance Evaluation in the Ibrahim Tower Construction Project Phase 1 at Roemani Muhammadiyah Hospital in Semarang

Authors

  • Alan Adi Nugroho Universitas Islam Sultan Agung Author
  • Eko Muliawan satrio Universitas Islam Sultan Agung Author

DOI:

https://doi.org/10.65310/f8ca6d09

Keywords:

Occupational Health and Safety, Frequency Rate, Risk Management, Construction Project, SMK3.

Abstract

This study evaluates Occupational Health and Safety (OHS) performance in the Ibrahim Tower Phase 1 Construction Project at Roemani Muhammadiyah Hospital, Semarang, using a field-based empirical quantitative descriptive-evaluative approach. The research integrates hazard identification, frequency rate measurement, and assessment of preventive implementation to determine overall safety performance. From 203 identified potential hazards within the project’s SMK3 documentation, 39 were verified as actual occurrences, representing 19.21 percent of the total identified hazards. Frequency Rate calculations based on 985,600 working hours indicate that all actual hazard variables fall within the low-risk category (FR ≤ 5), demonstrating controlled accident intensity. Questionnaire analysis involving managerial and operational personnel reveals good to very good levels of preventive implementation, supporting the low frequency findings. The integration of documented safety systems, empirical verification, quantitative risk measurement, and organizational commitment suggests that the project’s OHS management system functions effectively.  

Downloads

Download data is not yet available.

References

Adi, I. N. S., Riana, N., Ariawan, P., Budiarnaya, P., & Prayoga, I. G. N. A. A. (2024). Pengaruh Keselamatan Dan Kesehatan Kerja Terhadap Kinerja Pekerja Proyek Pembangunan Poliklinik Eksekutif Dan Rehab Rsud Sanjiwani Gianyar. Nata Palemahan: Journal Of Environmental Engineering Innovations, 1(1), 33-41. Https://Doi.Org/10.38043/Natapalemahan.V1i1.5321

Agusmaniza, R., Tripoli, B., Khairunnas, K., & Syahbana, M. (2024). Evaluasi Faktor-Faktor Pembiayaan Keselamatan Dan Kesehatan Kerja Pada Proyek Konstruksi Lanjutan Pembangunan Rumah Sakit Rujukan Regional Cut Nyak Dhien Meulaboh. Tameh, 13(2), 67-74. Https://Doi.Org/10.37598/Tameh.V13i2.177

Albar, R. F., & Johari, G. J. (2023). Evaluasi Kinerja Manajemen Konstruksi Proyek Pembangunan Kantor Dinas Kesehatan. Jurnal Konstruksi, 21(2), 249-256. Https://Doi.Org/10.33364/Konstruksi/V.21-2.1409

Anggrayni, I. N., & Beatrix, M. (2024). Evaluasi Faktor Yang Mempengaruhi Penerapan Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Gedung Smpn 9 Kota Kediri–Jawa Timur. Journal Of Scientech Research And Development, 6(1), 571-579. Https://Doi.Org/10.56670/Jsrd.V6i1.387

Atmaja, M. R. K., Susanto, S., & Rahmawaty, F. (2024). Manajemen Risiko Keselamatan Dan Kesehatan Kerja Pembangunan Gedung Perpustakaan Uin Sayyid Ali Rahmatullah Tulungagung. Publikasi Riset Orientasi Teknik Sipil (Proteksi), 6(1), 81-88. Https://Doi.Org/10.26740/Proteksi.V6n1.P81-88

Dwijayanti, N. A. (2018). Occupational Health And Safety (Ohs) Performance Programs On Plywood Factory In 2012-2016. The Indonesian Journal Of Occupational Safety And Health, 7(1), 102–111. Https://Doi.Org/10.20473/Ijosh.V7i1.2018.102-111

Febiani, D., Multazam, A. M., Sani, A., & Fachrin, S. A. (2024). Analisis Potensi Bahaya Pada Pekerja Facade (Curtain Wall) Dan Pengendalian Risiko Di Proyek Rumah Sakit Upt Vertikal Makassar. Window Of Public Health Journal, 5(6), 879-890. Https://Doi.Org/10.33096/Woph.V5i6.2033

Habibi, R., Carlo, N., & Rahmat, R. (2025). Penilaian Kinerja Bangunan Gedung Hijau Pembangunan Rsud Tanjung Redeb Berau. Konstruksia, 16(2), 44-52. Https://Doi.Org/10.24853/Jk.16.2.44-52

Hazlansyah, M., Mulyani, E., & Nuh, S. M. (2018). Analisis Evaluasi Keselamatan Dan Kesehatan Kerja (K3) Terhadap Kinerja Pekerja Konstruksi (Studi Kasus Proyek 7 In 1 Universitas Tanjungpura). Jelast: Jurnal Teknik Kelautan, Pwk, Sipil, Dan Tambang, 6(3). Https://Doi.Org/10.26418/Jelast.V5i3.30763

Indarta, F. A., Soetjipto, J. W., & Ratnaningsih, A. (2025). Rencana Keselamatan Konstruksi Pada Proyek Pembangunan Gedung Bertingkat: Evaluasi Dan Pengembangan. Jurnal Spesialis Teknik Sipil (Jspts), 6(2), 78-102. Https://Doi.Org/10.30996/Jspts.V6i2.132746

International Labour Organization. (2013). Kesinambungan Daya Saing Dan Tanggung Jawab Perusahaan (Score): Modul 4, Manajemen Sumber Daya Manusia Untuk Kerjasama Dan Usaha Yang Sukses. Ilo.

Kau, N. I. M., Utiarahman, A., & Pahrun, A. A. (2025). Analisis Penerapan Sistem K3 Pada Proyek Pembangunan Gedung Rawat Inap Rsud Hasri Ainun Habibie. Research Review: Jurnal Ilmiah Multidisiplin, 4(2), 898-907. Https://Doi.Org/10.54923/Researchreview.V4i2.237

Lating, R. F. S., Serang, R., Gaspersz, W., Apalem, D. R., & Tuanakotta, A. (2023). Analisis Pengaruh Keselamatan Dan Kesehatan Kerja (K3) Terhadap Kinerja Pekerja Pada Proyek Pembangunan Rumah Sakit Pratama Desa Hitu Kabupaten Malteng. Journal Agregate, 2(1), 94-100. Https://Doi.Org/10.31959/Ja.V2i1.1229

Meturan, W., Leuhery, L., & Titaley, H. D. (2023). Analisis Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (Smk3) Pada Pembangunan Gedung Pasar Mardika Kota Ambon. Journal Agregate, 2(1), 87-93. Https://Doi.Org/10.31959/Ja.V2i1.1237

Peraturan Pemerintah Republik Indonesia. (2012). Peraturan Pemerintah Nomor 50 Tahun 2012 Tentang Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja. Lembaran Negara Republik Indonesia Tahun 2012 Nomor 100.

Ramdan, F., Kunci, K., Bahaya, I., Kerja, K., & Hirarc, Dan. (2017). Identifikasi Bahaya Dan Penilaian Risiko Pada Divisi Boiler Menggunakan Metode Hazard Identification Risk Assessment And Risk Control (Hirarc) Hazard Identification And Risk Assessment In Boiler Division Using Hazard Identification Risk Assessment And Risk Control (Hirarc). Journal Of Industrial Hygiene And Occupational Health, 1(2). Https://Doi.Org/10.21111/Jihoh.V1i1.752

Rianda, H. (2025). Analisis Biaya Smkk Berdasarkan Permen Pupr No. 10 Tahun 2021 Pada Proyek Rs Mata Padang Eye Center. Civil Engineering Collaboration, 10-18. Https://Doi.Org/10.35134/Jcivil.V10i1.76

Risk Management Guidelines : Companion To As/Nzs 4360:2004. (2004). Standards Australia International ; Standards New Zealand.

Ro’is, R. R., Wahyudiono, Y. D. A., & Bahar, R. R. R. (2022). Iklim Keselamatan Kerja Dan Program K3 Di Proyek Pembangunan Gedung X Surabaya. Jurnal Penelitian Kesehatan" Suara Forikes"(Journal Of Health Research" Forikes Voice"), 273-282. Http://Dx.Doi.Org/10.33846/Sf13nk449

Santi, N. M. W. P., & Wirawan, I. M. A. (2025). Hubungan Antara Beban Kerja Dengan Kelelahan Kerja Pada Pekerja Bagian Finishing Di Proyek Pembangunan Gedung Pelayanan Rumah Sakit. Archive Of Community Health, 12(3), 1218-1241. Https://Doi.Org/10.24843/Ach.2025.V12.I03.P30

Stefanus, K., & Sulistio, H. (2022). Pengaruh Penerapan Sistem Manajemen Keselamatan Konstruksi Dan Protokol Kesehatan Covid-19 Terhadap Kinerja Waktu. Jmts: Jurnal Mitra Teknik Sipil, 71-86. Https://Doi.Org/10.24912/Jmts.V5i1.16541

Tjahjono, B., Zebua, D., & Mita, V. (2023). Analisis Kajian Literatur Risiko Keselamatan Dan Kesehatan Kerja (K3) Dalam Pembangunan Gedung Bertingkat Di Indonesia. Jurnal Penelitian Jalan Dan Jembatan, 3(2), 11-16. Https://Doi.Org/10.59900/Ptrkjj.V3i2.168

Wulandari, D. A. R., Trisiana, A., Kusuma, N. S. A. U., & Tistogondo, J. (2025). Pengaruh Kualitas Sumber Daya Manusia Terhadap Risiko Kegagalan Pencapaian Kinerja Menggunakan Metode Fault Tree Analysis (Studi Kasus: Proyek Pembangunan Rsptn Universitas Jember). Jurnal Ilmiah Mitsu (Media Informasi Teknik Sipil Universitas Wiraraja), 13(2), 235-252. Https://Doi.Org/10.24929/Ft.V13i2.4031

Yusuf, M., & Wibowo, H. (2022). Evaluasi Penerapan Keselamatan Dan Kesehatan Kerja (K3) Konstruksi Pada Proyek Pembangunan Rumah Sakit Mitra Siaga 2 Tarub Kabupaten Tegal: Evaluasi Penerapan Keselamatan Dan Kesehatan Kerja (K3) Konstruksi Pada Proyek Pembangunan Rumah Sakit Mitra Siaga 2 Tarub Kabupaten Tegal. Engineering: Jurnal Bidang Teknik, 13(2), 1-10. Https://Doi.Org/10.24905/Eng.V13i2.2057

Published

2026-02-21

How to Cite

K3 Performance Evaluation in the Ibrahim Tower Construction Project Phase 1 at Roemani Muhammadiyah Hospital in Semarang. (2026). Journal of Engineering and Applied Technology, 2(1), 111-121. https://doi.org/10.65310/f8ca6d09