Analisis Kelayakan Teknis dan Ekonomi Rekayasa Pembangunan Jalan Tol Seksi X Menggunakan Metode Life Cycle Cost

Penulis

  • Anugrah Heris Santri Universitas Ratu Samban Bengkulu Utara Penulis
  • Rezi Munizar Universitas Ratu Samban Bengkulu Utara Penulis
  • Hendret Susanto Universitas Ratu Samban Bengkulu Utara Penulis

DOI:

https://doi.org/10.65310/v84rt350

Kata Kunci:

Engineering Economy, Investment Feasibility, Life Cycle Cost, Toll Road, Transportation Infrastructure.

Abstrak

The imbalance between traffic volume growth and road infrastructure capacity has intensified congestion, reduced logistics efficiency, and increased emissions along urban and intercity transport corridors. This study evaluates the technical and engineering-economic feasibility of the proposed 15.5 km Section X Toll Road using the Life Cycle Cost (LCC) approach. An empirical quantitative method was employed by integrating road capacity analysis, geometric design, rigid pavement design, and investment evaluation using Net Present Value (NPV), Internal Rate of Return (IRR), Benefit–Cost Ratio (BCR), and Payback Period (PP) indicators. The results indicate that the proposed toll road reduces the degree of saturation of the existing arterial road from 0.85 to 0.42. Economic evaluation produced a positive NPV of IDR 542 billion, an IRR of 12.45%, a BCR of 1.18, and a payback period of 14 years and 3 months. Sensitivity analysis confirms that the project remains financially feasible under a 15% increase in construction costs and a 10% decline in toll revenue. These findings demonstrate that the Section X Toll Road is technically feasible, economically viable, and capable of supporting sustainable infrastructure investment.

Unduhan

Data unduhan tidak tersedia.

Referensi

Adawiyah, R., Riskijah, S.S., & Lydianingtias, D. (2024). Analisis Kelayakan Finansial Proyek Pembangunan Jalan Tol ABCD Seksi 4. JOS-MRK: Jurnal Online Skripsi Manajemen Rekayasa Konstruksi, 5(3), 240-245. https://doi.org/10.33795/jos-mrk.v5i3.5052

Badan Pusat Statistik. (2025). Provinsi dalam Angka: Analisis Pertumbuhan Ekonomi dan Transportasi. BPS: Jakarta.

Blank, L., & Tarquin, A. (2018). Engineering Economy (8th ed.). McGraw-Hill Education: New York.

Dell'Isola, A. (1997). Life Cycle Costing for Design Professionals (2nd Edition). McGraw-Hill.

Departemen Pekerjaan Umum. (1997). Manual Kapasitas Jalan Indonesia (MKJI). Direktorat Jenderal Bina Marga: Jakarta.

Farina, I., et al. (2020). Implementing Life Cycle Cost Analysis in Road Engineering: A Critical Review on Methodological Framework Choices. Renewable and Sustainable Energy Reviews. https://doi.org/10.1016/j.rser.2020.110284

Febrian, G., & Wibisono, M. A. (2025). Analisis Kelayakan Ekonomi Perancangan Pabrik Kelapa Sawit Mini Dengan Kapasitas 1000 Ton Per Tahun Menggunakan Metode Life Cycle Costing: Studi Kasus Desa Bukit Layang, Bangkabelitung. Jurnal Sosial Teknologi, 5(9), 3405-3415. https://doi.org/10.59188/jurnalsostech.v5i9.32396

Franata, H., Honesti, L., & Nandikk, M. (2025). Analisis Pengendalian Biaya Konstruksi Dengan Metode Life Cycle Cost (LCC) pada jembatan. Jurnal Bangunan, Konstruksi & Desain, 3(3), 96-111. https://doi.org/10.25077/jbkd.3.3.96-111.2025

Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2017). Manual Desain Perkerasan Jalan (MDPJ) No. 02/M/BM/2017. Direktorat Jenderal Bina Marga: Jakarta.

Munizar, R. (2024). Penerapan Earned Value Management (EVM) dalam Pengendalian Biaya dan Waktu Proyek Peningkatan Jalan (Doctoral dissertation, Universitas Andalas).

Nuzulia, F., & Negara, N. P. (2025). Analisis Kelayakan Investasi Proyek Pembangunan Jalan Tol Solo–Yogyakarta–Nyia Kulon Progo Seksi I Paket 1.1 Ruas Solo-Klaten. Journal of Disaster Mitigation and Civil Engineering Research, 3(1), 1-13. https://doi.org/10.29080/jomcer.v3i1.2363

Oktaviani, S., & Ayu Angreni, I. . (2022). Analisis Life Cycle Cost Perkerasan Komposit dan Lentur Jalan Tol Jagorawi. Jurnal Teknik Sipil , 29 (1), 79-88. https://doi.org/10.5614/jts.2022.29.1.8

Park, C. S. (2019). Contemporary Engineering Economics (6th ed.). Upper Saddle River: Pearson.

Prasetio, A., Khamid, A., Tolani, M., & Nurdin, A. L. (2025). Analisis Ekonomi Lapis Pondasi Bawah Telford Vs Rigid Pavement menggunakan Life Cycle Cost Analysis. Era Sains: Jurnal Penelitian Sains, Keteknikan dan Informatika, 3(3), 6-11. https://jurnal.eraliterasi.com/index.php/erasains/article/view/305

Prayogi, A. T., & Gunasti, A. (2026). Analisis Kelayakan Investasi Pembangunan Tol Layang Jakarta-Cikampek (MBZ) Menggunakan Metode NPV, IRR, BCR, dan Payback Period. Journal of Science and Engineering, 2(1), 22-29. https://journal.ajbnews.com/index.php/prothon/article/view/306

Sukirman, S. (1999). Perkerasan Lentur Jalan Raya. Penerbit Nova: Bandung.

Sukirman, S. (2010). Perencanaan Geometrik Jalan. Penerbit Nova: Bandung.

Susanti, B., Wirahadikusumah, RD, Soemardi, BW, & Sutrisno, M. (2019). Analisis Life Cycle Cost Pilot Project PBC untuk Jalan di Indonesia. Jurnal Teknik IIUM , 20 (2), 57–69. https://doi.org/10.31436/iiumej.v20i2.1075

Walls, J., & Smith, M. (1998). Life-Cycle Cost Analysis in Pavement Design. FHWA.

Yuliatti, M. M. E., & Husin, A. E. (2024, February). Life cycle cost analysis in system dynamic modeling on Indonesia’s green toll road. In AIP Conference Proceedings (Vol. 2710, No. 1, p. 060009). AIP Publishing LLC. https://doi.org/10.1063/5.0144138

Zhafir, M.H.A., Burhamtoro, & Subkhan, M.F. (2024). Kelayakan Finansial dalam Perencanaan Pembangunan Jalan Tol Malang–Kepanjen. JOS-MRK: Jurnal Online Skripsi Manajemen Rekayasa Konstruksi, 5(3), 240-245. https://doi.org/10.33795/jos-mrk.v5i3.4080

Unduhan

Diterbitkan

2026-07-13

Cara Mengutip

Analisis Kelayakan Teknis dan Ekonomi Rekayasa Pembangunan Jalan Tol Seksi X Menggunakan Metode Life Cycle Cost. (2026). Journal of Science, Technology, and Innovation, 2(1), 14-25. https://doi.org/10.65310/v84rt350