Identification and Analysis of Toll Road Project Implementation Risks Based on Severity Index: A Case Study of the Prabumulih–Muara Enim Toll Road

Authors

  • Kodrat Insany Taqwim Universitas Bina Darma Author
  • Firdaus Firdaus Universitas Bina Darma Author
  • Farlyn Rosyad Universitas Bina Darma Author

DOI:

https://doi.org/10.65310/v3wd3q31

Keywords:

Severity Index, Toll Road Project, Risk Analysis, Probability–Impact Matrix, Time and Cost Performance.

Abstract

This study investigates dominant risks affecting time and cost performance in the Prabumulih–Muara Enim Toll Road Project (Zone 5) within the Trans Sumatra Toll Road corridor. The research adopts an empirical quantitative approach using a two-stage questionnaire and semi-structured interviews involving 24 key project stakeholders selected through purposive sampling. Risk variables were initially compiled from literature, project documents, and preliminary site observations, then validated through a Guttman-scale screening process to ensure contextual relevance. The validated risks were subsequently assessed using the Severity Index (SI) to quantify perceived probability and impact levels, and further mapped into a Probability–Impact Matrix to classify risk criticality and prioritize mitigation. The findings demonstrate that dominant risks emerge not only from technical construction factors but also from managerial coordination, procurement delays, logistical constraints, and safety and quality compliance, which collectively intensify schedule slippage and cost escalation. Methodologically, the integrated SI–PIM framework strengthens risk prioritization by combining structured screening, quantitative severity measurement, and decision-oriented mapping, offering a replicable model for toll road risk governance in large-scale infrastructure projects.

Downloads

Download data is not yet available.

References

Akbar, K. M., & Jufriyanto, M. (2025). Analisis Risiko Keselamatan Dan Kesehatan Kerja Menggunakan Metode Hirarc Dan Hazop Di Area Fabrikasi. Jurnal Teknologi Dan Manajemen Industri Terapan, 4(4), 2027-2034. Https://Doi.Org/10.55826/Jtmit.V4i4.1349

Akdon, & Riduwan. (2010). Rumus Dan Data Dalam Analisis Statistika (Cet. Ke-2). Bandung: Alfabeta.

Badan Pengatur Jalan Tol. (2021). Laporan Tahunan Badan Pengatur Jalan Tol 2020: Transformasi Jalan Tol, Merajut Nusantara. Jakarta: Kementerian Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia.

Darmawi, H. (2008). Manajemen Risiko. Jakarta: Bumi Aksara.

Effendi, K., & Siregar, M. R. (2024). Mapping Of Latest Methods And Trends In K3 Emergency Response On Toll Roads: Literature Review. Radinka Journal Of Health Science, 2(1), 196-208. Https://Doi.Org/10.56778/Rjhs.V2i1.291

Iman, M., & Rusgiyarto, F. (2025). Analisa Manajemen Risiko Proyek Di Daerah 3t (Terluar–Terdepan–Tertinggal). Studi Kasus Pembangunan Jalan Di Pulau Siberut, Kep. Mentawai, Sumatera Barat. Jurnal Teknik: Media Pengembangan Ilmu Dan Aplikasi Teknik, 24(1), 24-33. Https://Doi.Org/10.55893/Jt.Vol24no1.722

Jolanda, M. M., Agustini, M., & Putri, R. D. A. (2025). Analisa Keselamatan Jalan Pada Masa Konstruksi Dengan Metode Kombinasi Work Zone Dan Hotspot Mapping. Jurnal Deformasi, 10(2), 234-246. Https://Doi.Org/10.31851/Deformasi.V10i2.20405

Marselina, S., Hasanuddin, A., & Putra, P. P. (2022). Analisis Risiko Proyek Pembangunan Jalan Tol Solo-Yogyakarta Seksi 1 Menggunakan Metode Severity Index. Jurnal Teknik Sipil Dan Teknologi Konstruksi, 8(2), 78-88. Https://Doi.Org/10.35308/Jts-Utu.V8i2.5226

Nugroho, H. P., & Purwanto, E. (2024). Analisis Manajemen Risiko Keselamatan Dan Kesehatan Kerja Pada Proyek Pembangungan Jembatan Berdasarkan Iso 31000: 2018. Journal Sains Student Research, 2(5), 194-206. Https://Doi.Org/10.61722/Jssr.V2i5.2632

Prabowo, S. H., & Anggita, R. (2023, October). Analisis Risiko Kecelakaan Kerja Pada Proyek Pembongkaran Unit Gas Kompresor Di Fasilitas Produksi Migas Menggunakan Bowtie. In Seminar Nasional Teknik Sipil (Vol. 1, Pp. 157-165). Https://Doi.Org/10.56071/Sintesi.V1i1.696

Prasetyo, A., Setyaning, L. B. T., & Riyanto, E. (2023). Literature Review: Analisis Manajemen Risiko Pada Proyek. Renovasi: Rekayasa Dan Inovasi Teknik Sipil, 8(1). Https://Doi.Org/10.30738/Renovasi.V8i1.14425

Putra, F. P., & Hidayat, T. (2024). Analisis Risiko Pada Proyek Pembangunan Jalan Tol (Studi Kasus Proyek Pembangunan Jalan Tol Terbanggi Besar–Pematang Panggang–Kayu Agung). Jurnal Kajian Teknik Sipil, 9(1), 1-19. Https://Doi.Org/10.52447/Jkts.V9i1.7166

Raditya, A., Wiguna, I. P. A., & Waliulu, Y. E. P. R. (2026). Faktor Dominan Penyebab Cost Overrun Pada Proyek Jalan Tol Dengan Skema Kpbu Di Indonesia. Sentri: Jurnal Riset Ilmiah, 5(1), 837-851. Https://Doi.Org/10.55681/Sentri.V5i1.5680

Santosa, B. (2009). Manajemen Proyek. Yogyakarta: Graha Ilmu.

Soemarno. (2008). Manajemen Risiko Proyek Konstruksi: Risiko Dan Analisisnya. Jakarta: Erlangga.

Soeparyanto, T. S., & Nuhun, R. S. (2025). Identifikasi Risiko K3 (Kesehatan Dan Keselamatan) Kerja Pada Peningkatan Ruas Jalan Ululakara-Palangga Di Kabupaten Konawe Selatan Provinsi Sulawesi Tenggara. Jurnal Kacapuri: Jurnal Keilmuan Teknik Sipil, 8(2), 257-271. Https://Dx.Doi.Org/10.31602/Jk.V8i2.19546

Sunarko, S., & Prasetyo, Y. P. W. (2025). Analisis Risiko K3 Dengan Hiradc Pada Proyek Flat Type 60 Tni Al Banyuwangi. Innovative: Journal Of Social Science Research, 5(4), 3490-3501. Https://Doi.Org/10.31004/Innovative.V5i4.20528

Thompson, P., & Perry, J. (1991). Engineering Construction Risk. London: Thomas Telford.

Wibowo, N. A., Andivas, M., Harits, D., & Misrianto, M. (2025). Job Safety Analysis (Jsa) Dengan Pendekatan Fmea Dan Fishbone Diagram Pada Pemasangan Scaffolding Dalam Proyek Instalasi Annulus Operating Access. Journal Of Industrial Engineering And Operation Management (Jieom), 8(2). Https://Dx.Doi.Org/10.31602/Jieom.V8i2.17240

Williams, C. A., Smith, M. L., & Young, P. C. (1998). Risk Management And Insurance. Boston, Ma: Mcgraw-Hill.

Wulandari, D. A. R., Trisiana, A., Kusuma, N. S. A. U., & Tistogondo, J. (2025). Pengaruh Kualitas Sumber Daya Manusia Terhadap Risiko Kegagalan Pencapaian Kinerja Menggunakan Metode Fault Tree Analysis (Studi Kasus: Proyek Pembangunan Rsptn Universitas Jember). Jurnal Ilmiah Mitsu (Media Informasi Teknik Sipil Universitas Wiraraja), 13(2), 235-252. Https://Doi.Org/10.24929/Ft.V13i2.4031

Zayed, T., Amer, M., & Pan, J. (2008). Assessing Risk And Uncertainty Inherent In Chinese Highway Projects Using Ahp. International Journal Of Project Management, 26(4), 408–419. Https://Doi.Org/10.1016/J.Ijproman.2007.05.012

Published

2026-02-12

How to Cite

Identification and Analysis of Toll Road Project Implementation Risks Based on Severity Index: A Case Study of the Prabumulih–Muara Enim Toll Road. (2026). Journal of Science, Technology, and Innovation, 1(3), 01-21. https://doi.org/10.65310/v3wd3q31