Construction of a Box Culvert for Flood Mitigation on the Main Road in Talang Rimbo Village, Rejang Lebong Regency
DOI:
https://doi.org/10.65310/hp295884Keywords:
Box Culvert, Urban Drainage, Design Flood Discharge, Hydraulics, Flood MitigationAbstract
Urban flooding in areas with high transportation activity is an infrastructure problem influenced by increased surface runoff, limited drainage capacity, and changes in land-use characteristics. This study aims to analyze design flood discharge, evaluate existing drainage capacity, and design box culvert dimensions as a flood control solution on the Main Road of Talang Rimbo Village, Rejang Lebong Regency. The research method employs a quantitative approach based on hydrological and hydraulic analysis through calculations of design rainfall using the Gumbel distribution, Mononobe rainfall intensity, and Rational Method flood discharge, as well as an evaluation of channel capacity using Manning’s equation. The results show that the design flood discharge reaches 5.54 m³/s, while the capacity of the existing channel is only 0.28 m³/s, resulting in a capacity deficit of 5.26 m³/s. A box culvert with dimensions of 1.6 m × 1.8 m can increase flow capacity and provide a technical solution to the flooding problem. This study contributes to the development of urban drainage designs based on hydrological and hydraulic approaches to enhance infrastructure resilience against flood risks.
Downloads
References
Afrizal, R. F., Ramadhan, R. S., & Fatikasari, A. D. (2026). Analisis Kinerja Box Culvert Terhadap Debit Banjir Rencana Di Kecamatan Pakal Surabaya. axial: jurnal rekayasa dan manajemen konstruksi, 010-018. https://doi.org/10.30742/axial.v14i1.5093.
Agustina, F., Suci, S. P., Liana, U. W. M., Haris, A., & Pane, I. (2026). Peran Mahasiswa dalam Pelaksanaan Pekerjaan Road Crossing Pada Proyek Peningkatan Saluran Drainase Untuk Mengurangi Kelebihan Debit Banjir di Jalan Cipto Mangunkusumo Kecamatan Samarinda Seberang, Samarinda, Kalimantan Timur. Jurnal Pengabdian Masyarakat Inovasi Indonesia, 4(1), 9-16. https://doi.org/10.54082/jpmii.1031.
Al Ashari, K. A., & Utama, R. W. J. (2025). Perencanaan Pembangunan Box Culvert Pada Access Road PKP-PK di Bandar Udara Rahadi Oesman Ketapang. Aviation Science and Technology Journal, 1(02), 60-72. https://doi.org/10.54147/astj.v1i02.1352.
Ananda, N., Sari, I. O., Zahro, I. N. A., Perkasa, M. D. R., Permana, F. S. E., Hadianto, N. K., & Al Amin, M. N. F. (2026). Manajemen Bencana Banjir Rob dalam Meningkatkan Ketahanan Masyarakat di Kelurahan Simo Surabaya. Jurnal Ilmu Administrasi Negara, 23(1), 46-62. https://doi.org/10.59050/jian.v23i1.457.
BSN. (2016). SNI 2415:2016 Tata Cara Perhitungan Debit Banjir Rencana.
Hartanto, T., Yuuono, A. B., Krisnawati, E., & Karsono, D. (2022). Penataan Infrastruktur Saluran dan Taman Di Jalan Kahuripan Utama Kelurahan Sumber. Jurnal Pengabdian Kepada Masyarakat Tunas Membangun, 2(1). https://doi.org/10.36728/tm.v2i1.2087.
Kamil, E. M., Asysyauki, A. H., & Diem, A. F. (2023). Urban design approach to flood problem in Palembang City. Jurnal TekstuReka, 1(1), 14-24. https://doi.org/10.32502/tekstureka.v0i0.6283.
Kementerian PUPR. (2018). Perencanaan Sistem Drainase Perkotaan.
Leihitu, D. D. J., & Prasetyo, A. (2024). Analisis Kapasitas Penampang Box Culvert Pada Proyek Land Development Sub-Wp 1c Di Kecamatan Sepaku Kabupaten Penajam Paser Utara. Jurnal Penelitian Jalan dan Jembatan, 4(1), 34-45. https://doi.org/10.59900/ptrkjj.v4i1.208.
Manvaati, A. K., Farizal, B., & Sriwahyuni, W. (2025). Analisis Stabilitas Lereng Pasca Longsor Di Jalan Lintas Curup-Lebong Desa Talang Ratu Kecamatan Rimbo Pengadang Kabupaten Lebong. Statika: Jurnal Teknik Sipil, 11(2), 25-31. https://doi.org/10.53494/jts.v11i2.1210.
Maulani, T. A., & Syamsir, S. (2024). Implementasi Kebijakan Mitigasi Bencana Banjir di Nagari Sicincin. Publicness: Journal of Public Administration Studies, 3(4), 420-425. https://doi.org/10.24036/publicness.v3i4.234.
Nanda, M. P., & Kurniawati, M. (2023). Metode Pekerjaan Box Culvert Untuk Drainase Perkotaan Yang Berkelanjutan. Statika: Jurnal Teknik Sipil, 9(2), 1-11. https://doi.org/10.53494/jts.v9i2.296.
Nurhuda, R. S., Siswanto, E., & Azhari, F. M. (2025). Analisa Perbandingan Efisiensi Waktu Dan Biaya Uditch Dan Box Culvert Untuk Penanganan Saluran Existing. Racic: Rab Construction Research, 10(2), 659-669. https://doi.org/10.36341/racic.v10i2.6438.
Paunno, D. D., Lewakabessy, G., & Maitimu, N. R. (2025). Perencanaan Box Culvert Dan Estimasi Anggaran Biaya Pada Ruas Jalan Oma–Wassu Kabupaten Maluku Tengah. Jurnal Penelitian Multidisiplin Bangsa, 2(4), 820-831. https://doi.org/10.59837/jpnmb.v2i4.599.
Permadi, D., & Huda, M. (2018). Analisa risiko aspek biaya pekerjaan saluran box culvert (Studi kasus jalan Kenjeran dan Tenggumung Kota Surabaya). axial: jurnal rekayasa dan manajemen konstruksi, 6(2), 53-68. https://doi.org/10.30742/axial.v6i2.507.
Purboseno, S., Hartanto, Y., Riyanto, D. P., & Kusumadewi, H. S. (2023). Kajian Kemampuan Bangunan Hikmat Menjaga Keamanan Insfrastruktur Kereta Api dari Bahaya Banjir. Syntax Literate; Jurnal Ilmiah Indonesia, 8(8), 5894-5903. http://dx.doi.org/10.36418/syntax-literate.v6i6.
Putri, D. A., Wardani, F. K., Maharani, A. D. A., & Nurhajati, N. (2026). Implementasi Program Pemerintah dalam Pembangunan Drainase Jalan Teuku Umar Tulungagung sebagai Upaya Pengendalian Banjir dan Peningkatan Kebijakan Lingkungan. Jurnal Widya Mahavira, 2(1), 16-23.
Santoso, T. H., Mirajhusnita, I., & Yusuf, M. (2023). Penanganan banjir di lingkungan Universitas Pancasakti Tegal dengan menggunakan sistem drainase U-ditch dan box culvert. Engineering: Jurnal Bidang Teknik, 14(1), 77-85. https://doi.org/10.24905/eng.v14i1.2006.
Saputra, C. A., & Maini, M. (2025). Kajian Stabilitas Konstruksi Culvert Bridge dalam Mitigasi Debit Banjir Kala Ulang 50 Tahun di Kawasan Industri Gas Kabupaten Barito Utara. Science Tech: Jurnal Ilmu Pengetahuan Dan Teknologi, 11(1), 77-92. https://doi.org/10.30738/st.vol11.no1.a19190.
Saputri, N. E., Banjarsanti, S. S. N., & Ananda, F. (2024). Sinergi Mahasiswa dan Pemerintah dalam Proyek Rehabilitasi Jembatan Box Culvert Di Kecamatan Muara Badak Melalui Pendanaan Bankeu. Jurnal Pengabdian kepada Masyarakat Nusantara, 6(1.1), 508-516. https://doi.org/10.55338/jpkmn.v6i1.1.5204.
Sulardi, S. (2018). Mengatasi Limpasan Banjir Dengan Metode Redimensi Parsial Badan Air Sungai. Jurnal Riset Pembangunan, 1(1), 1-9. https://doi.org/10.36087/jrp.v1i1.23.
Wikanto, R. I., & Wibisono, R. E. (2024). Evaluasi Saluran Drainase Rayon Tandes Terhadap Saluran Diversi Pada Box Culvert Di Jalan Babat Jerawat Surabaya. Jurnal Media Publikasi Terapan Transportasi, 2(3 (Desember)), 326-336. https://doi.org/10.26740/mitrans.v2n3.p326-336.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Dwi Aji Ttriono, Rezi Munizar (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.