[1]
“Evaluation of the Synchronization of Excavation and Loading Equipment and Cover Layer Removal Transport Equipment at PT XXY”, Scripta Technica, vol. 2, no. 1, pp. 10–20, Feb. 2026, doi: 10.65310/13vb1212.