“K3 Performance Evaluation in the Ibrahim Tower Construction Project Phase 1 at Roemani Muhammadiyah Hospital in Semarang” (2026) Journal of Engineering and Applied Technology, 2(1), pp. 111–121. doi:10.65310/f8ca6d09.