“Comparison of Cost and Construction Time for Drainage Projects Using a 150×150 cm Box Culvert and a Slab Culvert on Simpang Lebong Highway, Curup Subdistrict, Rejang Lebong Regency” (2026) Journal of Engineering and Applied Technology, 2(1), pp. 413–424. doi:10.65310/gk75vg78.