K3 Performance Evaluation in the Ibrahim Tower Construction Project Phase 1 at Roemani Muhammadiyah Hospital in Semarang. (2026). Journal of Engineering and Applied Technology, 2(1), 111-121. https://doi.org/10.65310/f8ca6d09