Comparison of Cost and Construction Time for Drainage Projects Using a 150×150 cm Box Culvert and a Slab Culvert on Simpang Lebong Highway, Curup Subdistrict, Rejang Lebong Regency. (2026). Journal of Engineering and Applied Technology, 2(1), 413-424. https://doi.org/10.65310/gk75vg78