Analysis of Production Bottlenecks Caused by Rusted Materials Using the Theory of Constraints Method at Workshop 2 of PT. Triangle Motorindo. (2026). Journal of Engineering and Applied Technology, 2(1), 219-228. https://doi.org/10.65310/mc3qrq79