[1]
2026. Analysis of Production Bottlenecks Caused by Rusted Materials Using the Theory of Constraints Method at Workshop 2 of PT. Triangle Motorindo. Journal of Engineering and Applied Technology. 2, 1 (May 2026), 219–228. DOI:https://doi.org/10.65310/mc3qrq79.